Showing 361–379 of 379 results

Pak Arab Tee Brass 1/2″ x 1/2″

 290
  • Pak Arab Tee Brass 1/2″ x 1/2″
  • Hot Water System
  • Pvc Fittings
  • Astm F-438 Sch-40 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Tee Brass 1/2″ x 3/4″

 504
  • Pak Arab Tee Brass 1/2″ x 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Tee Brass 1″ x 1″

 1,354
  • Pak Arab Tee Brass 1″ x 1″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Tee Brass 3/4″ x 3/4″

 761
  • Pak Arab Tee Brass 3/4″ x 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1-1/2″

 1,720
  • Union 1-1/2″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1-1/2″

 207
  • Pak Arab Union 1-1/2″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1-1/4″

 1,260
  • Union 1-1/4″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1-1/4″

 2,412
  • Pak Arab Union 1-1/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1″

 172
  • Union 1″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1/2″

 63
  • Union 1/2″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 1″

 1,011
  • Pak Arab Union 1″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 2″

 2,522
  • Pak Arab Union 2″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 3/4″

 97
  • Union 3/4″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 3/4″

 516
  • Pak Arab Union 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 3″

 21,655
  • Pak Arab Union 3″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Union 4″

 37,376
  • Pak Arab Union 4″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Wye 1-1/2″

 841
  • Pak Arab Wye 1-1/2″
  • Sewerage/Cold Water System
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Wye 1-1/4″

 614
  • Pak Arab Wye 1-1/4″
  • Sewerage/Cold Water System
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Wye 2-1/2″

 2,510
  • Pak Arab Wye 2-1/2″
  • Sewerage/Cold Water System
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective