Showing 91–120 of 379 results

Pak Arab Coupling 3″

 210
  • Pak Arab Coupling 3″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling 4″

 293
  • Pak Arab Coupling 4″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling 6″

 795
  • Pak Arab Coupling 6″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling 8″

 4,329
  • Pak Arab Coupling 8″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling Brass 1-1/4″ x 1-1/4″

 1,008
  • Pak Arab Coupling Brass 1-1/4″ x 1-1/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling Brass 1/2″ x 1/2″

 140
  • Pak Arab Coupling Brass 1/2″ x 1/2″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling Brass 1/2″ x 3/4″

 190
  • Pak Arab Coupling Brass 1/2″ x 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling Brass 1″ x 1″

 553
  • Pak Arab Coupling Brass 1″ x 1″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Coupling Brass 3/4″ x 3/4″

 316
  • Pak Arab Coupling Brass 3/4″ x 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Cowel 2″

 189
  • Pak Arab Cowel 2″
  • Sewerage/Cold Water System
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Cowel 3″

 294
  • Pak Arab Cowel 3″
  • Sewerage/Cold Water System
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Cowel 4″

 399
  • Pak Arab Cowel 4″
  • Sewerage/Cold Water System
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Cpvc Solvent 118 ml

 1,440
  • Pak Arab Cpvc Solvent 118 ml
  • Astm F-439 Sch-80 CPVC Fittings
  • Hot Water System
  • Pvc Fittings
  • Long Working Life
  • Cost Effective

Pak Arab Cpvc Solvent 237 ml

 2,521
  • Pak Arab Cpvc Solvent 237 ml
  • Astm F-439 Sch-80 CPVC Fittings
  • Hot Water System
  • Pvc Fittings
  • Long Working Life
  • Cost Effective

Pak Arab Cpvc Solvent 473 ml

 4,710
  • Pak Arab Cpvc Solvent 473 ml
  • Astm F-439 Sch-80 CPVC Fittings
  • Hot Water System
  • Pvc Fittings
  • Long Working Life
  • Cost Effective

Pak Arab Cpvc Solvent 59 ml

 999
  • Pak Arab Cpvc Solvent 59 ml
  • Astm F-439 Sch-80 CPVC Fittings
  • Hot Water System
  • Pvc Fittings
  • Long Working Life
  • Cost Effective

Pak Arab Cpvc Solvent 946 ml

 8,269
  • Pak Arab Cpvc Solvent 946 ml
  • Astm F-439 Sch-80 CPVC Fittings
  • Hot Water System
  • Pvc Fittings
  • Long Working Life
  • Cost Effective

Pak Arab Elbow Brass 1-1/4″ x 1-1/4″

 1,910
  • Pak Arab Elbow Brass 1-1/4″ x 1-1/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Elbow Brass 1/2″ x 1/2″

 378
  • Pak Arab Elbow Brass 1/2″ x 1/2″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Elbow Brass 1/2″ x 1/2″

 290
  • Pak Arab Elbow Brass 1/2″ x 1/2″
  • Hot Water System
  • Pvc Fittings
  • Astm F-438 Sch-40 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Elbow Brass 1/2″ x 3/4″

 405
  • Pak Arab Elbow Brass 1/2″ x 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Elbow Brass 1″ x 1″

 1,354
  • Pak Arab Elbow Brass 1″ x 1″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab Elbow Brass 3/4″ x 3/4″

 597
  • Pak Arab Elbow Brass 3/4″ x 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 1-1/4″

 195
  • Pak Arab End Cap 1-1/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 1/2″

 35
  • Pak Arab End Cap 1/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 1″

 98
  • Pak Arab End Cap 1″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 2″

 293
  • Pak Arab End Cap 2″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 3/4″

 44
  • Pak Arab End Cap 3/4″
  • Hot Water System
  • Pvc Fittings
  • Astm F-439 Sch-80 CPVC Fittings
  • Material: CPVC (Chlorinated Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 3″

 552
  • Pak Arab End Cap 3″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective

Pak Arab End Cap 4″

 881
  • Pak Arab End Cap 4″
  • Pvc Fittings
  • Material: PVC (Polyvinyl Chloride)
  • Long Working Life
  • Cost Effective